Boston Health Sciences Campus

Gross Anatomy Lab

Project Manager: Jack McDonald
Description: Design and Construction of a new Gross Anatomy Lab for 200 students including 42+ anatomy tables, one classroom, locker rooms, an embalming suite with cold storage, a new staircase, supplemental infrastructure including a new air handling unit, shafts, new ductwork, and a new lift. The project scope also includes relocation of third floor occupants into other locations at BRPH.
Est. Start: On-going
Est. Finish: 6/1/2018

Dental Vertical

Project Manager: Jack McDonald
Construction Manager: Shawmut
Description: The scope of work includes construction services to correct significant vertical circulation issues at the Tufts School of Dental Medicine building by adding a fifth elevator on the exterior of the building. Located at 1 Kneeland St, Boston. The proposed project will also require relocation of the main entry from Kneeland Street to Washington Street, supported by a renovated entry facade and lobby.
Est. Start: 1/1/2018
Est. Finish: 9/2/2019

Jaharis Roof Replacement

Project Manager: Margaret Moylan
Description: Reaching close to 14 years of age, the roof is now at the end of its useful life. There are various tears and punctures due to constant install and repairs on existing roof equipment, jeopardizing the integrity of the system. In addition to the wear and tear, it was found in a report completed by a consultant in early 2017, that nearly 30% of the tested upper roof membrane contains damp/wet/saturated roof insulation.
Est. Start: 5/6/2018
Est. Finish: 8/31/2018

Dental Small Projects

Project Manager: Chris Baryluk
Description: This work will include new storage space at the 9th level for tanks, manifolds and a system of piping to the 8th floor to distribute the gas.
Est. Start: 4/15/2018
Est. Finish: 6/30/2018


Grafton Campus

Multi-Purpose Teaching & Simulation Lab (MTSL)

Project Manager: Tom Koch
Description: This room will provide an accreditation-required animal prep space for animals to be sedated and prepped for surgery by October 2018.
Est. Start: 5/3/2018
Est. Finish: 9/30/2018

Amelia Peabody Pavilion

Project Manager: Jack McDonald
Description: Architectural & Engineering feasibility study to identify best use program options and cost associated with renovation of the non-vivarium research laboratory and office space at the Tufts Cummings School of Veterinary Medicine’s Amelia Peabody Pavilion (Peabody) located on the Grafton Campus.
Est. Start: 10/19/2017
Est. Finish: TBD